23.10.2012
today at 8am we went too the eshed and done the first part of the concrete assessment til 9am and then mark gave us some math equations for the second part of the concrete assessment til 10am then we had first break til 10.20am then back to eshed and carried on with the maths and then after we went too the workshop and me a nd tk started on the third bedroom wardrobe and done top skirting boards. we cut it too size and glued and nailed it up then at 12pm we had lunch break til 1pm then after that we went back too workshop and done the finishes on the house then done a quick clean up. then we done some tasks analysis and assessment catch up til 3pm then had last smoko break til 3.20pm then we carried on assessments til 4.30pm then home time.
this pictures are ov wat the house looks like inside at the moment...
No comments:
Post a Comment