at 8am we went too the eshed and done started the assessment for roof cladding til 9am and then went the workshop and we started doing the nailing up of the weather boards til 10am then we had smoko break.
at 10.20am we went in the house and put a window in. then after that we done the rest of the nailing up the weather boards up and after that i helped tk and daryn put the fibre cement sheet up in the perimeter of the house.
then after that i started doing the construction of the scaffolding on the outside of the house til 12pm then had lunch break til 1pm then went back too the workshop and carried on with the scaffold construction til 3pm til 3.20pm then went to the workshop and we done a quick clean up and that was us for the day..
nailing up the end of the scaffold |
nailed together of the scaffold end |
same as above |
corner of scaffold |
fibre cement sheet been put up |
the same as above |
me nailing up the fibre cement sheet |
scaffold |
scaffold |
scaffold |
scaffold an part of the house |
weather boards been nailed up completely |
the perimeter of the roof |
conan drilling where to nail for the weather boards |
nailing in weather boards |
same as above |
nail punching |
tk drilling |
same as above |
jig saw |
window sil for the outside |
mark jig sawing the window sil for the outside |
calculations for window sil for outside |
same as above |
same as above |
same as above |
the sil with a finished cut |
philip measuring the window sil |
the window sil gaps for the water to run through when it rains |
justin chiseling the window sil |