Wednesday 28 November 2012

Sunday 18 November 2012

19.11.2012.
9am we went to eshed and i done more assessment catch up on moodle til 10am then had first break til 10.20am then carried on with moodle assessments and done some paper based assessments til 12pm then had lunch break til 1pm and matt helped me with the paper based calculations assessment for concrete and then i handed in all the concrete assessments ready for marking and done the rest of the moodle work til 3pm then had last break til 3.20pm and i done the concrete and the concrete calculations and sent them so everything ready for marking and i left at 4pm..
13.11.2012
8am we went straight to the eshed and i started the concrete paper based assessments til 10am then had first break til 10.20am then matt gave me a update of me assessments to tell us which 1s werent done on the moodle account. then at 11am we filled out a form for what we thought bout the course and what we thought could have been done better pretty much yeah..then at 12pm we had lunch break til 1pm then we went back to the eshed and carried on with the assessment catch up on both moodle and paper based til 3pm then had last break til 3.20pm and carried on doing the same til 4.30pm.

Tuesday 6 November 2012

06.11.12
at 8am we went straight up stairs in classroom and matt went over the formwork concrete assessment information with us and gave a booklet with information too study for the assessment and also the real assessment and at 9am we went too the eshed and mark went over some concrete calculations for the for reinforcing steel and also gave us a booklet too help us then we made a start on the reinforcing assessment til 10am then had first break til 10.20am and then went too eshed and carried on with the reinforcing calculations assessment til 11am then i made a start on the formwork concrete assessment til 12pm the had lunch break til 1pm then went back too the eshed and then carried on with the formwork assessment til 2pm then i done some moodle task analysis and assessments on moodle til 3pm then had last break til 3.20pm and then i carried on with the assessment catch up on the moodle and done more on the formwork assessment and mark went over the steps for the construction formwork from profiles to bracing then at 4.30pm we went home

Tuesday 23 October 2012

23.10.2012
today at 8am we went too the eshed and done the first part of the concrete assessment til 9am and then mark gave us some math equations for the second part of the concrete assessment til 10am then we had first break til 10.20am then back to eshed and carried on with the maths and then after we went too the workshop and me a nd tk started on the third bedroom wardrobe and done top skirting boards. we cut it too size and glued and nailed it up then at 12pm we had lunch break til 1pm then after that we went back too workshop and done the finishes on the house then done a quick clean up. then we done some tasks analysis and assessment catch up til 3pm then had last smoko break til 3.20pm then we carried on assessments til 4.30pm then home time.

































this pictures are ov wat the house looks like inside at the moment...

Saturday 20 October 2012

16.10.2012
at 8am we went too the eshed and mark told us that we had the concrete assessment coming up on the 17.10.2012. and that there is 4 parts of the written assessment then we went too the workshop and me and tackie started on the hall way skirting boards til 10am then we had first smoko break til 10.20am then went back too the workshop and me and tk started on the 3rd room skirting boards and measured it then cut it too long so we had too trim it about 7mm shorter the made it fit in til 12pm then had lunch break til 1pm then went back workshop and me and went back too the workshop and carried with skirting boards right round the room til 3pm then had last smoko break til 3.20pm then glued and nailed the skirting on then at 4pm we done a quick clean up of the house til 4.30pm then home time
15.10.2012.
at 9am we went straight to the eshed and mark gave us a plan too work out how many interior doors were in the house for the calculations of the interior hardware calculations assessment til 10am then we had first smoko break til 10.20am then we went back too the eshed and done the labelling assessment for the steps of installing the interior doors. then done the interior hardware quiz with mark til 12pm then had lunch break til 1pm then went into the workshop and started on the skirting boards and the achaves on the store room til 3pm then had last smoko break til 3.20pm then went back too workshop and carried on doing the store room achave for the door til 4pm then done quick clean up til 4.30pm then home time




this is the plan too work out the number of interior doors..

10.10.2012
at 8am we went to eshed and done some task analysis catch up til 10am then had first smoko break til 10.20am then we went back and carried on doing the task analysis til 11am then we then we went too workshop and matt showed us how too instore archave round the windows and also showed us how too instore the skirting boards then matt asked and showed me how too fix the interior doors too a tight and straight fit til 12pm then we had lunch break til 1pm then we went back to the workshop and i carried on with the fixing of the interior doors round the house til 3pm then we had last break til 3.20pm then we had quick clean up of the inside and outside of the house til 4pm then done assessments and task analysis til 4.30pm then home time




Wednesday 19 September 2012

18.09.2012:
at 8am we went straight to eshed and we went on computers and done some assessment catch up til 9am then matt gave us a worksheet of a saw horse and gave us a quick run down with them then we got the tops then went into joinery class and we used the straght edge machine and also the thicknesser.
and then we back into eshed to make a start on the saw horses cutting out the slots for legs and i just done measurements and also markings then at 10am we had first break til 10.20am.
then we went back and then me brenden john and tom went into joinery class too use the grinders to sharpen the chisels.then after that we went back too eshed to cut out slots for the legs of the saw horses.
then at 11.50am we got told after lunch we were going on a little trip for timber terminology after lunch at 12.50pm. then we went down til 3pm and then went home.

Saturday 15 September 2012

12.09.2012.
at 8am we went straight to the e shed and went on the computers to do some assessment til 9am then matt told us we were installing the interior doors and gave us the steps we should follow.
Steps on an interior door:
1./ Check floor for level
2./ Check openings/ Door size
3./ Position door in centre
4./ Pack hinge side to plumb
4 packers
5./ dry fit door - Check tollerances - gap width adjust in necessary
6./ screw hinge jamb off
- jamb should be flush with the gib
7./ pack openings jamb, maintaining a 2-3mm gap
8./ fix remainer of jamb
then matt showed us how too install the first door in the lounge room so we had an idea on how to do it.
then at 10am we had first break til 10.20am then we back to the work shop and carried on doing the interior door insulation til 12pm then had lunch break til 1pm then me tucky and tk started on the sliding doors for the wallrope in entrance way. then at 2.50pm we had a quick house clean up til 3pm then had last break til 3.20pm then went back to workshop and done blogging til 4.30pm.




screwing in interior door

tuckie drilling

tuckie drilling

dyran and tuckie installing the first interior door

tuckie drilling


tuckie screwing in the door jamb


same as before

the first 2 doors installed

the hall way with doors installed

tk checking if wall is level

same as before

the start of wallrope door