Tuesday 23 October 2012

23.10.2012
today at 8am we went too the eshed and done the first part of the concrete assessment til 9am and then mark gave us some math equations for the second part of the concrete assessment til 10am then we had first break til 10.20am then back to eshed and carried on with the maths and then after we went too the workshop and me a nd tk started on the third bedroom wardrobe and done top skirting boards. we cut it too size and glued and nailed it up then at 12pm we had lunch break til 1pm then after that we went back too workshop and done the finishes on the house then done a quick clean up. then we done some tasks analysis and assessment catch up til 3pm then had last smoko break til 3.20pm then we carried on assessments til 4.30pm then home time.

































this pictures are ov wat the house looks like inside at the moment...

Saturday 20 October 2012

16.10.2012
at 8am we went too the eshed and mark told us that we had the concrete assessment coming up on the 17.10.2012. and that there is 4 parts of the written assessment then we went too the workshop and me and tackie started on the hall way skirting boards til 10am then we had first smoko break til 10.20am then went back too the workshop and me and tk started on the 3rd room skirting boards and measured it then cut it too long so we had too trim it about 7mm shorter the made it fit in til 12pm then had lunch break til 1pm then went back workshop and me and went back too the workshop and carried with skirting boards right round the room til 3pm then had last smoko break til 3.20pm then glued and nailed the skirting on then at 4pm we done a quick clean up of the house til 4.30pm then home time
15.10.2012.
at 9am we went straight to the eshed and mark gave us a plan too work out how many interior doors were in the house for the calculations of the interior hardware calculations assessment til 10am then we had first smoko break til 10.20am then we went back too the eshed and done the labelling assessment for the steps of installing the interior doors. then done the interior hardware quiz with mark til 12pm then had lunch break til 1pm then went into the workshop and started on the skirting boards and the achaves on the store room til 3pm then had last smoko break til 3.20pm then went back too workshop and carried on doing the store room achave for the door til 4pm then done quick clean up til 4.30pm then home time




this is the plan too work out the number of interior doors..

10.10.2012
at 8am we went to eshed and done some task analysis catch up til 10am then had first smoko break til 10.20am then we went back and carried on doing the task analysis til 11am then we then we went too workshop and matt showed us how too instore archave round the windows and also showed us how too instore the skirting boards then matt asked and showed me how too fix the interior doors too a tight and straight fit til 12pm then we had lunch break til 1pm then we went back to the workshop and i carried on with the fixing of the interior doors round the house til 3pm then we had last break til 3.20pm then we had quick clean up of the inside and outside of the house til 4pm then done assessments and task analysis til 4.30pm then home time