Tuesday, 29 May 2012

 30.05.2012.
this morning i done the tasks analysis til bout 9am then after that we went into the workshop and i started the wall fram dovetails til 10am then we had a smoko break til 10.20am and then we come back too the workshop and carried on doing dovetails i did marking and measuring and done the slots for the timber and i cut 3 of them and finish 2 of them.
then at 12pm we had smoko break and til 1pm than after that went too workshop and i carried on with the dovetails then matt asked me too help him with the subfloor hardwares i drilled them on on one side.
then at 3pm we had last smoko break til 3.20pm then when we come back we did a quick clean up in workshop and started blogging.







subfloor hardware being screwed in

subfloor hardware being screwed in





photo of me doing the dovetails for wall frame
i was measuring the dovetails


this is part of what the house looks like at the moment
roof framing on the house.

Sunday, 20 May 2012

21.05.2012:
objects used was a pen books for writting in information and our classroom computers..

today i need catch up work for the assessments and the assessment task analsis for site set out, flooring and piles.

Friday, 11 May 2012

11.05.2012.

tools used was hammer,nails,measuring tape,carpenter pencil,glue gun and step ladders..
power tools used was skill saw electric drill and skill saw and bench saw..

today we done the rest of the wall and ceilings and also put the doors up..
i cut the left over of the timbers in the shed to 905cm long and stacked them um and the off cuts i stacked them up next too it..
rounded up cows to the back of the house paddock..
we also finished at 3.30pm and before we left we put a a security door for the weekend so nobody can break in..


one of the houses wayne and workers built

another house they built

another house wayne and workers built

long shot of the whole house

side of the house

side of the house

side shot of the back of the house

back door

back of the house

guttering

main room

toilet wall frame

second room framing

third bedroom

the timber cut at 905cm

Add caption




bench saw


framing timber in the shed


ceiling in the house


second main room door


bathroom window and wall frame


third room wallrobe


fourth room wall frame


second room frame from outside


window and wall frame of first room


the back of the house


the back windows of the house


radial arm saw


the shed


the inside shed


the front of the house
10.05.2012.
Hand tools used was hammer,rule,nails,carpenter pencil,standley knife step ladder and saw horse..
Power tools used electric drill,electric screw drive and glue gun and skill saw,arm saw and gun nail gun..

Today at 8.30am i done work experience with wayne bishop and i helped him and his workmates put up the gib board for the ceiling and bryan used the electric screw drive too screw it up some of the gib board had 50x50x50 for one end then after 150 all the way down the board then then the other ends were 50x50x50 (this is called braced) thats how the screws got screwed then me and brent nails the the top and the bottom the same pattern too how bryan done it... then we done the same with some walls when we put them up um also some wall gib boards were screwed and nailed in a different way because of the wires inside coming out from the ceilings this type of gib was called (standard gib board) the screws were all 150 centres..
Wayne and bryan showed me how too use a hammer in a safe way and told me too let my wrist do the work not the whole hand and that the nails had too be in plumb for when the plaster's dont have too go over and pre check them after them also easier too do plaster..

Then at 10.30 we had smoko then 11.00 we carried on doing the ceilings and walls..

then had lunch at 1.30pm then we rounded up the cows at the back then carried on with the inside of the house doing walls and ceiling..

i took photo's of the walls and the house and some house wayne and his workers done last year...


the front end of the house

one of the front bathroom windows

the windows of the house

the back door and the window frames

bryans radial arm saw


the shed

the walls and the inside of the shed

the front room wall frame with pink batts and walls put up with a window

the wall frame of the main room

long shot of the house


the second room wall frame and window with pink batts

wall frame of the third room


a side shot of third room


Add caption


the wall frame of fourth room

saw horse in second room puting walrobe wall up

the ceiling in the house


the wall of the second main room

top wall frame of the window and window and also ceiling

the door frames


the wall with the light swith in second main room

third room putting door in

wall frame with wires

the second room inside

the basement

the first room inside

the hall way with the gib timber

the main room

front door from inside

wall frame back right hand side of main room with window

the main room walls and gib timber

the guttering for house

Add captionthe main room doors

the back of the house and roof and windows

the back door and windows