at 8am i done some catch up with the assessments and did worksheets resit for roof structure til 10am then we had smoko break til bout 10.20am then after that me and philip carried on doing the weatherboards til 12pm then had lunch break til 1pm then come back too workshop and me and philip carried on with the weatherboards... til 3pm then had smoko
steps of doing weatherboards:
-we measured the timber then ran the measuring tap against the house and we measured to the closest stud to reach the timber measurement.
then got measurement and marked the measurement on to the timber so we could cut a 45 degree angle.
then we cut the timber at 45 degree angle too length.
then to keep it from rotting we put primer paint on then place it on straight and plumb and nailed it up
-then we measured the house for the rest of the weather board and cut another angle at 45 degrees and placed it on the end of the nailed weather board once plumb straight and level we then nailed it up.
- last step before starting next row i then checked it for straightness
weather boards picture on house |
more pictures |
more pictures |
more pictures |
more pictures |
weather boards on house pictures |
No comments:
Post a Comment