at 9am we went too the classroom with mark and he went over the types of linings.
types of lining:
*MDF 20mm+ *fibre plaster *Gib-board *tiles *concrete *plywood *decrotive timber *stone wall *rumed earth *hardie glaze.
wet areas:
-aqualine
-aqua tough
-treated ply
-pawel
-villaboards
-hardie glaze
fire rated areas:
-gib- fire board
-rabboard
-villaboard- jarub hardies
-concrete
high impact areas:
-gib tough line
-gib- fire rock aqua - tough
-concrete
secure areas:
-gib fibre rock aqua tough
-concrete
-gib tough line
dry areas:
-gib board standard
-mdf
-plywood
high finished areas:
-gib ultra line
noise rooms:
-gib noise line
bracing- areas:
-brace line
-fibre line
-plywood
-hardie flex
-concrete
-tough line
-fibre rock aqua line - tough
-aqua line
-mdf
then at 10am we had first break til 10.20am and me philip and john started putting up the ceiling gib- board.
the first room ceiling gib put up |
me philip and john cutting the next sheet |
a square rule for a straight line cut |
the glue put on |
we put up the temperary sheet of gib |
ther measurements of the gib |
the first sheet in the lounge been put up |
brad put up ceiling battens |
brad put in the joiner
then at 3pm we had last break til 3.20pm then we
went back too workshop and had a quick clean
up then started doing assessments and blogging til
4.30pm then went home.
|
No comments:
Post a Comment