04.09.2012.
at 8am we went to classroom up stairs with matt til 9am then after that we went to the workshop and me and we done the ceiling gib- boarding and put them up til 10am then we had first break til 10.20am and went back to the e-shed and me and philip started on the end of the house top weatherboard til 12pm then had lunch break til 1pm then went back to workshop and carried on doing the weatherboard til 3pm then had last break til 3.20pm and then done clean up of the workshop then after that we done blogging til 4.30pm.
|
philip getting ready too cut the weatherboard to length |
|
philip using the circular saw to cut weatherboard |
|
the peice of the weather board that sits on window flashing |
|
picture of the wallrope |
|
facing board and scibers installed for an external corner |
|
ceiling gib installed |
|
lounge ceiling gib installed |
|
battens on to hold glue |