Tuesday, 11 September 2012

11.09.2012.
at 8am we went too classroom upstairs and matt went over the interior linings with us.
Noiseline:
Gib noiseline is used as a double layer
standard Gib is pretty much used for everything.

fyreline:
has a high density core which resists exposure to fire to fire longer than standard gib
provides up to four hours fire protection.

types of gib:
standard
ultraline
fyreline
brace
aqualine

alternative interior linings:

type of linings:
plywood
masonry/stone
chip board/particle/OSB
coratone
hardie glaze
pinex
squd plaster
timber panel

plywood:plywood is available in species and finishes.
plywood is very tough
plywood can be used to line walls
used for floors
used to build kitchen cabinetry
MDF- Medium- density fibreboard
MDF is a very high product finish resistant to impact than drywall.
mainly used for kitchen cabinetry.
don't use for bathrooms or laundry.

fibre cement sheet:
is very resistant to moisture and decay.
used mainly for outside materials.
sheets can be produces in tapered measures.
can be also used as masonry substrate.
fibre cement sheet is produced in different dimensions and thicknesses.

soffit linings = 4.5mm
wet areas = 9mm (interior linings)
exterior substrate = 4.5mm
weatherboards = 18mm
compressed sheet = 18mm

fibrous plaster:
gypsum plaster cast in sheets, cornices, corbels etc.

tounge and groove:
used to line ceilings, floors, walls and kitchen cabinetry.

sarking board:
a thin board of wood used for sheadings.
the sarking was covered in news papers.
may stop drafts.

then at 9am we went to eshed and got ready to go in workshop and me and justin carried on doing the lounge gibs on the wall til 10am then had first break til 10.20am then went back and carried on wall gibs and justin taught me how too use a electric screw gun properly. then at 12pm we had lunch break til 1pm then we went back and started the last wall gib in the lounge til we ran outer long sheets of gib. then after that we done a quick clean up of the house til 3pm then had last break til 3.20pm then went too eshed got computers and done blogging and i left early with brenden at 4pm to go home.





















the above pictures are of what the inside of the house looks like at the moment..


tk putting up side wallrope gib for the wall..

tuckie screwing up wallrope wall gib

tk cutting the gib with the gib knife/saw to cut to line up the wall lining.