at 8am we went to e-shed and we got the computers out and we done some assessment catch up til 10am then after that we had first break til 10.20am then after that we went too workshop and started installing the wall gib in the lounge til 12pm then had lunch break til 1pm then went back to the the workshop carried on doing wall gibs in lounge til 3pm then had last break til 3.20pm then went back to workshop and carried on with the same til 4.20pm then had quick clean up then home time.
mark showing us how to do the nailing and measurements for the gib |
mark showing us how to glue sheets of gib up |
mark showing us the way to screw up the wall gib when going up vertical |
first sheet installed |
wallrope gib installed |
brendon installed wall rope gib |
e-jay screwing up the wall gib |
e-jay placing the gib in place |
wall gib installed |
darryn glueing |
switch slot |
two switches slots |
switch slot |
calculations for the light switches |