at 9am we went too the eshed and matt gave us a worksheet a pre inspection sheet.
we filled that out then had first break from 10am til 10.20am then we went back to eshed and went straight to the workshop and we carried on with the wall gibs in the lounge.
til 12pm then at 12pm we had lunch break til 1pm then after that we went back into workshop and carried on with the lounge wall gibs til 2.50pm then had a quick clean up til 3pm then had last break til 3.20pm then went too eshed and we done the alternative wall cladding calculations with matt til 4.30pm.then went home.









 the pictures above is of what the inside of house looks like at the moment..
pre inspection sheet 1/1

pre inspection sheet 1/2

corner mould peice for windows..